Piedmont High School Athletic Field Reconstruction
Project Location: Piedmont, California
Client: Piedmont Unified School District
Project Type(s): Athletic Field, K-12
Services: Geotechnical Investigation and Construction Observation
Geo-Engineering Solutions (GES) collaborated with the landscape architecture team at Verde Design and the facilities staff of the Piedmont Unified School District to assess the existing athletic field and develop geotechnical recommendations for its reconstruction. The original field suffered from severe drainage issues caused by a combination of site hydrology challenges and aggregate filtration deficiencies.
GES contributed engineering solutions to resolve the drainage concerns and provided extensive construction observation and testing services to ensure the quality and performance of the newly constructed field and track.